Quote:
Originally Posted by JayJay
Its NOT the headend. The building is empty. Apart from sales staff and Install Techs and Service Techs. The Headend is in Newton abbot.
|
Hmm. I asked the field sales rep, and he said that it (Endeavour House) *was* the headend, which is why they haven't vacated the building. All the technical stuff is apparently underground.
Although this is the same guy that told me Plymouth wasn't yet 10 meg, and unless that changed in the week or so between me asking him and me getting installed, he was wrong about that - the modem is definitely synced at 10 meg and I'm usually getting well over 4 meg.
It's a mystery!
Sam