Re: Garden Bridge Cancelled
Incredible how so much could have been spent - on WHAT?
Were they allowed to push too far ahead into the design process.
Before actually getting into preparing to build, all that was really needed was a realistic cost estimate, and some concept designs of how the top will look, and what keeps it up, now that may have needed running some numbers etc.
|