Quote:
Originally Posted by pip08456
If you didn't turn it down then you mustn't have took up the offer. Same difference I would think.
If it wasn't offered then you wouldn't have knowledge of it. It may have been a limited time offer.
|
I think I made myself clear when I said I had an engineer arranged to complete the install, do you think I wouldn't have known what was offered to me, and just accepted a date and time for installation, without knowing what I was offered?