Saint man
14-02-2006, 19:22
How is the best way to find out if my installation date is still correct. Every time I ring NTL I keep on getting told to ring different numbers. The reason why I ask is that I was due to be installed 27/1/06 but was told some work had to be done before this could go ahead and had a note put through my door saying construction date 16/2/06, install date 21/2/06. Now the other weekend someone came and dug up my pavement put in the NTL flip up box, and I assume they had pulled the cable through from accross the road. Was this the construction work that was mentioned?
Do I assme that on the 21st they will come and do the install, is this posted thru door letter the one I should be working to, or must I wait for another emailed one.
Also I have rec'd 4 letters 2 each on 2 separate occasions about my bank details etc. and it looks like they have set up 2 different accounts.
I am totally confused about the whole process. Any input would be welcome, thanks
Do I assme that on the 21st they will come and do the install, is this posted thru door letter the one I should be working to, or must I wait for another emailed one.
Also I have rec'd 4 letters 2 each on 2 separate occasions about my bank details etc. and it looks like they have set up 2 different accounts.
I am totally confused about the whole process. Any input would be welcome, thanks