PDA

View Full Version : Superhub upload speed roll-out update


Martin_D
01-03-2012, 10:41
upload speed improvements roll-out update

http://shop.virginmedia.com/content/dam/allyours/pdf/Schedule-23-02-12.pdf

General Maximus
01-03-2012, 10:46
everywhere is "available" now apart from 4 or 5 places which are down for April. Wtf are they doing in March?

Martin_D
01-03-2012, 10:52
Will i don't know why cuz Uddingston looks like its ready ?

Upstream Channels
Lock Status Modulation Channel ID Max Raw Bit Rate Frequency Power
Locked ATDMA 1 20480 Kbits/sec 35800000 Hz 40.5 dBmV

Kabaal
01-03-2012, 11:09
Mine's one of the few areas that say it's not available till April, at least i think Kirkcaldy comes under Glenrothes.

The upstream channel changed to 35.8 and the symbol rate to 5120 recently but the max traffic rate is still 1750000 bps with the same ole 200kb/s upload as always. Getting really tired waiting now for a decent upload speed and being one of the few places in the country that doesn't have it yet isn't making it any better.

qasdfdsaq
01-03-2012, 16:32
Another schedule, another delay.

@Martin Dee
The upgrades are not rolled out across an entire area at the same time, the schedule is only updated to "Available now" when all (well almost all) of an area is finished. Based on the rest of the country, the actual increased upload speed may become available anywhere between 3 weeks and 3 months after you see the physical upgrades done for your line.

Stephen
01-03-2012, 17:30
Martin as per before there is no need to start a new thread every time you talk about the speed upgrades. You can add it to an existing thread.

http://www.cableforum.co.uk/board/12/33685620-uddingston-improvements.html#post35382369