albertsteptoe
17-03-2009, 08:54
Hello all.
I need some advice, im geting 50mb installed on Wednesday 25th march. i still have cables installed in my flat from when i had there TV/BB theres a spilter installed on my wall.I told Virgin i took cables out when i left them the cable that is left is for the TV service, should i just leave it there & let the engineeer change the bit on the end of cable to work with BB service, or should i just get rid of cable & let them install a new one as im paying for installing service. thanks for any help advice.
I need some advice, im geting 50mb installed on Wednesday 25th march. i still have cables installed in my flat from when i had there TV/BB theres a spilter installed on my wall.I told Virgin i took cables out when i left them the cable that is left is for the TV service, should i just leave it there & let the engineeer change the bit on the end of cable to work with BB service, or should i just get rid of cable & let them install a new one as im paying for installing service. thanks for any help advice.