Quote:
|
Originally Posted by Paul
Was thinking the same thing 
|
I dont know anything about that area, but if its an old network requiring lots of work/money to bring up to scratch it could be true as ntl are just trying to spend as little as possible on the plant side of things.
ntl have shut down a number of networks, including one fairly modern 860MHz system.