Quote:
Originally Posted by telfordcable
i had been told it will be 50mb ready for all uk nationwide on the monday, december 15th 2008 and i had been told there will be no need of nationwide roll out but need to sign up online on the 1th december to order 50mb called XXL at £52 a month with free router cable (support 50mb) and will be in a 12 months contract. The upload will be 1.2mb. Going up to 2.4mb in 2009. also been told that 50Mb will be STM (traffic management) 12 hours of 16Mb throttling.
|
There will be a % of the network available for sales from mid December, then it will increase through Jan 09.. Then full rollout will complete in stages throughout the first half of 2009.
So there will be areas that don't have 50Mb/s until around June/July 09.