|
Re: Waiting for Installation
There is quite high demand for the V+ at the minute, some have got dates quite soon, I guess it depends how big demand is in your area.
3 Weeks is'nt too long.
__________________
Abit AI7, Intel P4 HT @ 3.06Ghz, 2 Gb Corsair PC3200 RAM, ATI 9600XT 256Mb GFX, 2 x 80Gb Maxtor SATA (RAID 0), Maxtor 250 Gb (IDE), Maxtor 500 Gb (Ext),Win XP MCE, Xbox 360, PS3, Samsung 24" LCD, Samsung 40" LCD
|